ADNOC Offshore - Expansion of Upper Zakum Field Development: Package 2

General Information
Owner ADNOC Offshore
Masterplan Project (Parent Profile) ADNOC Offshore – Expansion of Upper Zakum Field Development – Abu Dhabi
Location Abu Dhabi, Emirate of Abu Dhabi, UAE
Status --
Sector Oil, Upstream, Oil Extraction
Contract Type Engineering Procurement Construction (EPC)
Onshore/Offshore Onshore
Greenfield/Brownfield Greenfield
Progress 0
Estimated Budget Value ---
Contract Value 850
Net Value $850m
Award Date July 2026
Completion Date December 2028
Last Updated On July 2026
ProjectId (Old, New) 556920, 556920


ADNOC Offshore is undertaking the development of the expansion of the Upper Zakum Offshore Field Development Package 2 in Abu Dhabi, the UAE.

This project leverages artificial islands, AI-enabled control systems, and clean-grid power to significantly boost oil production capacity in the Upper Zakum offshore concession. It aims to raise current output from around 1.0 million barrels per day to 1.5 million bpd. Key components include new wellhead facilities, separation and processing units, utilities, water injection systems, pipelines, and modernization tie-ins.

The outcomes will include greater reliability, reduced emissions through the use of cleaner energy and digital automation, enhanced reservoir recovery, and strengthened long-term production to support both domestic demand and export requirements.

This project is a part of the Expansion of the Upper Zakum Field Development

The US$850 million project includes the following:

1. Installation of a gas lift compression system to enhance gas production

2. Installation of gas dehydration and vapour recovery units to process gas

3. Installation of seawater intake pumps and a filtration system for the water supply

4. Installation of the electrochlorination package for water treatment

5. Installation of instrument air and air dryer packages for operational support

6. Installation of nitrogen generation and chemical injection packages for process control

7. Installation of pipe racks and modular rooms for infrastructure support

8. Laying of onshore pipeline and associated tie-ins for gas transport

9. Upgradation of multiple decks at gas lift platforms for operational efficiency

10. Construction storage facilities and lay infield pipelines

Second Section

23 July 2026

NMDC Energy has been appointed as the main contractor on the project. (Source: MEED)

09 July 2026

Wood, Worley, and KBR have been appointed as the project management consultant (PMC) on the project. (Source: MEED)

07 June 2026

The bids are still under evaluation, and NMDC Energy is said to be the favourite to win the main EPC contract. (Source: MEED)

21 April 2026

The client is in final discussions to award the main contractor, and the main contract bids are still under evaluation.

16 March 2026

The main contract tender is not yet awarded.

29 January 2026

The commercial bids have been submitted on the project. Larsen & Toubro, Tecnicas Reunidas and Technip amongst other companies have submitted the bids.

09 January 2026

The main contract commercial bid submission deadline is due on January 15, 2026. (Source: MEED)